Int4 Suite technical installation consists of several steps that require administrative and/or developer access to the main installation system and also to the systems in scope of testing (e.g. SAP PO, SAP CPI, S/4HANA).
The installation process starts from deciding on the installation system and deployment architecture. We recommend the centralized installation on SAP Solution Manager, but for a smaller or constrained environments, decentralized installation might be also a valid option.
Please start by going thru the Int4 Suite installation options page to understand the difference and make an informed decision on the installation architecture.
Make sure to validate the prerequisites for the installation.
Once the target installation system and systems in scope of test are defined, please proceed with following installation steps.
Installation step | Instructions and details |
---|---|
Install Int4 Add-on | |
Configure ABAP roles for Int4 Suite users | There are no instructions provided, as role configuration is a customer specific process, usually under audit and control. Int4 Suite provides a set of role templates to simplify security team work: Role Templates |
Configure Fiori services | |
Configure Fiori roles | |
Deploy modules on ABAP systems in scope of tests | |
Prepare ABAP connection roles for systems in scope of tests | There are no instructions provided, as role configuration is a customer specific process, usually under audit and control. nt4 Suite provides a set of role templates to simplify security team work: Role Templates |
Prepare SAP PI/PO servers in scope of tests | |
Prepare SAP PI/PO RFC connection users and roles | There are no instructions provided, as role configuration is a customer specific process, usually under audit and control. Specifics of required roles are provided here: Roles for SAP PI/PO communication user |
Prepare SAP CPI connections & access |
After the technical installation is complete, please proceed to Int4 Suite Configuration